Tehodemo@northstar.example

Work Profile

Coordination load is 21% of in-scope time. Three activity groups account for two-thirds of that.

Coordination load
21%
Process overhead
24%
Top 3 groups
67% of load

Judgement-rich work

24%

Target direction: grow

↑ 5% vs Apr

Core execution

32%

Support with better context

↑ 5% vs Apr

Coordination load

21%

Reduce avoidable loops

↑ 5% vs Apr

Process overhead

15%

Simplify or automate

↑ 5% vs Apr

Avoidable burden

8%

Remove or reduce

↑ 5% vs Apr

Work Profile Map

?
Group byDomainDownload

Share of observed time (width) and annualised cost (area) by activity domain and group.

Human judgementCore executionCoordination loadProcess overheadAvoidable burden
Annualised cost (area · height)
Share of observed time (width)
Friction hotspotLower confidence
i

What this shows. Width shows share of observed time. Area shows annualised cost. The map only expands team-level patterns that passed the readout boundary; protected or below-confidence activity remains grouped.

Target mix hypothesis

What the readout suggests changing

Derived display

Shrink

Renewal evidence reconstruction, Decision follow-up loops

Standardize or automate

Manual control-pack assembly

Keep human led

Client work

Evidence states

Safe reading guide

Emerging

Observed but not graduated into a stable reportable baseline.

Excluded

Outside the agreed evidence base.

Suppressed

Protected because the value cannot be shown safely at this level.