Tehodemo@northstar.example

Pulse

Baseline locked; Cycle C in progress (Day 14 of 30). Two confidence metrics moved this cycle.

Baseline
Apr 30
Cycle
C · Day 14/30
BaselineApr 30 baseline
Cycle A · Mar£8.32M
Cycle B · Apr£8.18M
Cycle C · May£8.04M proj
Cycle D · Jun
Cycle E · Jul
Cycle F · Aug
QuarterlyQ3 board

Proof metrics

3

Metrics selected for Pulse tracking.

Current values

2

Current checkpoint values safe to show.

Protected

1

Metrics using safe labels instead of precise values.

Provider

Fixture static

Synthetic checkpoint overlay for contract validation

Demo Pulse

Pulse is tracking selected proof metrics from the Study baseline.

Synthetic demo checkpoint overlay. Current values appear only where the workspace contract makes them safe to show.

Proof metrics

Baseline to current checkpoint

Static fixture Pulse overlay

Questions

What Pulse is checking

QuarterlyDid standardized renewal inputs reduce reconstruction burden without weakening relationship quality?Renewal reconstruction burden
QuarterlyDid automated control-pack assembly reduce manual prep while keeping packs decision-useful?Manual control-pack assembly burden

Patterns

Lifecycle tracking

Renewal evidence reconstructionRenewal reconstruction burden
Active
Manual control-pack assemblyManual control-pack assembly burden
Active
Decision follow-up loopsDecision follow-up loops
Decaying
AI-assisted meeting notesNo proof metric linked
Emerging